June 14 through June 21, 2019
Palm Beach County traffic will be affected this week by ongoing construction projects and maintenance work, Florida Department of Transportation (FDOT) officials report. Weather permitting; closures will be in effect on I-95 and in other areas throughout Palm Beach County for construction activities.
For around-the-clock, real-time, I-95 traffic information, call 511. To view real-time video of I-95 in Palm Beach County, visit the Florida Department of Transportation’s Palm Beach SMART SunGuide Transportation Management Center (TMC) website at smartsunguide.com. FDOT and the SunGuide™ Partners provide these free services. For updated lane closure information, please refer to d4fdot.com. Follow us on Twitter at MyFDOT_SEFL.
CONSTRUCTION PROJECTS
INTERSTATE 95
I-95 Interchange from Hillsboro Boulevard to SW 10th Street
Description: Work on this 1.5-mile interim interchange improvement project includes widening I-95 southbound to add an auxiliary lane from the Hillsboro Boulevard entrance ramp to the SW 10th Street exit ramp, widening the existing I-95 southbound exit ramp to SW 10th Street, addition of a free-flow right turn lane to westbound SW 10thStreet and widening of westbound SW 10th Street to add an acceleration lane.
Cost/Completion: $4.5 million. Completion is expected in June 2019.
Traffic Impact:
- None anticipated. For more information, please contact Andrea Pacini, Community Outreach Specialist, 561-214-3358.
I-95 from south of SW 10th Street to south of Glades Road (95 Express Phase 3B-1)
Description: Work on this 4.8-mile 95 Express project includes widening and converting the existing I-95 HOV Lanes to Managed Lanes which will result in two tolled Express Lanes in each direction; the number of General Use lanes will remain the same. Other project improvements include bridge widenings at Palmetto Park Road and Camino Real, complete bridge replacement at the Hillsboro Canal, noise wall construction, portable traffic monitoring sites, toll gantry installation, Intelligent Transportation System (ITS) installation, ramp signaling at the I-95 entrance ramps from Palmetto Park Road, Express Lane markers and landscape relocation. For more information, please contactCommunity Outreach Specialist Andrea Pacini at 561-214-3358. Cost/Completion: Construction cost is $102 million. Completion is expected in spring 2022.
Traffic Impact:
- I-95 will have three lanes closed in each direction nightly, as needed, Sunday through Thursday, between SW 10th Street and Glades Road, with the first lane closing at 9:30 p.m., the second lane closing at 10:30 p.m., and the third lane closing at 11:30 p.m. until 5:30 a.m.
- Palmetto Park Road at I-95 will have two lanes closed in each direction nightly, as needed, Sunday through Thursday. The first lane will close at 9 p.m., and the second lane will close at 10:30 p.m. All lanes will be opened by 5:30 a.m.
- Palmetto Park Road at I-95 will have one lane closed in each direction daily, as needed, 9:30 a.m. until 3:30 p.m., Monday through Friday.
- Camino Real at I-95 will have one lane closed in each direction daily, as needed, 9:30 a.m. until 4 p.m., Monday through Friday.
- Full Closure Notice: Palmetto Park Road at I-95 will undergo a full closure for new bridge construction, 10:30 p.m. until 5 a.m., Monday night, June 17. Eastbound traffic will be detoured via Hillsboro Road and I-95, westbound traffic will be detoured via I-95 and Glades Road. FHP will be on site to assist motorists. Please see detour flyer attached.
- The I-95 northbound exit ramp to Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via I-95 northbound, Hillsboro Boulevard, and Military Trail. FHP will be on site to assist motorists.
- The I-95 southbound entrance ramp from westbound Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Military Trail and Hillsboro Boulevard. FHP will be on site to assist motorists.
- The I-95 southbound entrance ramp from eastbound Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Military Trail and Hillsboro Boulevard. FHP will be on site to assist motorists.
- The northbound entrance ramp from eastbound and westbound Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via I-95 southbound to Hillsboro Boulevard to I-95 northbound.
- The I-95 northbound entrance ramp from eastbound Hillsboro Boulevard will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Military Trail and Palmetto Park Road. FHP will be on site to assist motorists.
- The I-95 northbound entrance ramp from westbound Hillsboro Boulevard will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Military Trail and Palmetto Park Road. FHP will be on site to assist motorists.
- The I-95 northbound exit ramp to eastbound Hillsboro Boulevard will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Palmetto Park Road and South Dixie Highway. FHP will be on site to assist motorists.
- The I-95 northbound exit ramp to westbound Hillsboro Boulevard will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Palmetto Park Road and Military Trail. FHP will be on site to assist motorists. Please note that ramp closures will be performed as needed per paving production; consecutive ramps will not be closed at the same time. For more information, please contact Andrea Pacini, Community Outreach Specialist, 561-214-3358.
I-95 Interchange Improvements at Atlantic Avenue
Description: Work includes widening the I-95 northbound entrance ramp from Atlantic Avenue, creating a dedicated lane for I-95 northbound and southbound access from westbound Atlantic Avenue, construction of two turn lanes from westbound Atlantic Avenue; one to northbound Congress Avenue and one to southbound Congress Avenue, milling, resurfacing, pavement markings for improved safety and visibility, realigned crosswalks for improved pedestrian safety, internally illuminated and electronic display signs, signalization, pedestrian detectors, and traffic monitoring sites. Pavement markings for bike lanes will be included throughout the project.
Cost/Completion: $5.2 million. Completion is expected in spring 2020.
Traffic Impact:
- Atlantic Avenue from 13th Avenue to NW 23rd Avenue will have two through lanes closed daily, as needed, 10 a.m. until 2:30 p.m. and nightly, as needed, 9 p.m. until 5 a.m., Sunday through Saturday.
- The Atlantic Avenue north sidewalk from 12th Avenue to NW 23 Avenue is closed completely for roadway reconstruction. Pedestrians will be detoured to the south sidewalk via existing crosswalks.
- Congress Avenue from NW 1st Street to Atlantic Avenue will have one southbound through lane closed nightly, as needed, 9 p.m. until 5 a.m., Sunday through Saturday.
- The I-95 northbound entrance ramp from Atlantic Avenue will have the inside lane closed nightly, as needed, 9 p.m. until 5 a.m., Sunday through Thursday. For more information, please contact Andrea Pacini, Community Outreach Specialist, 561-214-3358.
I-95 Milling & Resurfacing from north of Atlantic Avenue to north of Gateway Boulevard
Description: This 7.66-mile milling and resurfacing project includes drainage improvements, new guardrail installation, rumble strips, signing and pavement markings and traffic monitoring site installation along I-95. Other improvements at select ramps along the corridor include: curb and gutter, sidewalks, and detectable warnings.
Cost/Completion: $15 million. Completion is expected in spring 2020.
Traffic Impact:
- I-95 between Atlantic Avenue and Gateway Boulevard will have up to three lanes closed in each direction nightly, as needed, Sunday through Thursday, with the first lane closing at 9 p.m., the second lane closing at 10 p.m., and the third lane, if needed, closing at 11 p.m. until 5 a.m.
- The I-95 northbound entrance ramp from Boynton Beach Boulevard will be closed nightly, 11:30 p.m. until 5 a.m., Sunday through Thursday. Eastbound traffic will be detoured via US-1 to Gateway Boulevard and west to I-95. Westbound traffic will be detoured via Congress Avenue north to Gateway Boulevard and east to I-95.
- The I-95 southbound entrance ramp from Boynton Beach Boulevard will be closed nightly, 11:30 p.m. until 5 a.m., Sunday through Thursday. Eastbound traffic will be detoured via US-1, south to Woolbright Road and west to I-95. Westbound traffic will be detoured via Congress Avenue, south to Woolbright Road, and east to I-95.
- The I-95 southbound exit ramp to Boynton Beach Boulevard will be closed nightly, 11:30 p.m. until 5:00 a.m., Sunday through Thursday. Southbound traffic will be detoured via Woolbright Road to Congress Avenue or via US-1 and Boynton Beach Boulevard.
- The I-95 northbound exit ramp to Boynton Beach Boulevard will be closed nightly, 11:30 p.m. until 5:00 a.m., Sunday through Thursday morning. I-95 northbound traffic will be detoured via Gateway Boulevard to Congress Avenue or via US-1 and Boynton Beach Boulevard.
- The I-95 northbound exit ramp to Woolbright Road will be closed nightly, 11:30 p.m. until 5:00 a.m., Sunday through Thursday morning. I-95 northbound traffic will be detoured via Boynton Beach Boulevard to Congress Avenue or via US-1 and Woolbright Road.
- The I-95 southbound exit ramp to Woolbright Road will be closed nightly, 11:30 p.m. until 5:00 a.m., Sunday through Thursday morning. I-95 southbound traffic will be detoured via Boynton Beach Boulevard to Congress Avenue or via US-1 and Woolbright Road.
- The I-95 northbound entrance ramp from Gateway Boulevard will be closed nightly, as needed, 11:30 p.m. until 5 a.m., Sunday through Thursday. Eastbound traffic will be detoured via Hypoluxo Road, US-1 and I-95. Westbound traffic will be detoured via Hypoluxo Road, Congress Avenue and I-95.
- The I-95 southbound entrance ramp from Gateway Boulevard will be closed nightly, as needed, 11:30 p.m. until 5 a.m., Sunday through Thursday. Eastbound traffic will be detoured via US-1, Woolbright Road and I-95. Westbound traffic will be detoured via Congress Avenue, Woolbright Road and I-95.
- The I-95 southbound exit ramp to Gateway Boulevard will be closed nightly, as needed, 11:30 p.m. until 5:00 a.m., Sunday through Thursday. Southbound traffic will be detoured via Hypoluxo Road to Congress Avenue or via US-1 and Gateway Boulevard.
- The I-95 northbound exit ramp to Gateway Boulevard will be closed nightly, as needed, 11:30 p.m. until 5:00 a.m., Sunday through Thursday morning. I-95 northbound traffic will be detoured via Hypoluxo Road to Congress Avenue or via US-1 and Gateway Boulevard. Please note that consecutive ramps will not be closed at the same time. For more information, please contact Andrea Pacini, Community Outreach Specialist, 561-214-3358.
I-95 Interchange Improvements at Woolbright Road
Description: Work includes widening Woolbright Road from SW 18th Street to SW 2nd Street, including roadway approaches and bridges over I-95 and the railroad tracks to provide dual eastbound left turn lanes onto northbound I-95, widening the I-95 northbound entrance ramp to receive the newly constructed dual eastbound left turn lanes, reconstructing the I-95 southbound exit ramp to provide a free-flow right turn onto westbound Woolbright Road.
Cost/Completion: $9.1 million. Completion is expected in June 2019.
Traffic Impact:
- None anticipated. For more information, please contact Andrea Pacini, Community Outreach Specialist, 561-214-3358.
I-95 Interchange at Hypoluxo Road
Description: Work on this interim interchange improvement project includes reconfiguring the existing roadway approaches and bridges over I-95 and the CSX railroad tracks, constructing dual eastbound left turn lanes onto I-95 and widening the existing I-95 southbound exit ramp to lengthen the turn lanes.
Cost/Completion: $4.85 million. Completion is expected in June 2019.
Traffic Impact:
- None anticipated. For more information, please contact Andrea Pacini, Community Outreach Specialist, 561-214-3358.
I-95 Interchange Improvements at 10th Avenue North
Description: Work includes widening 10th Avenue North from Barnett Drive to “A” Street, including roadway approaches and bridges over I-95 and the railroad tracks to provide dual eastbound turn lanes onto I-95, widening the I-95 northbound entrance ramp to receive the newly constructed dual eastbound left turn lanes and widening the existing three-lane I-95 southbound exit ramp to four lanes to provide dual left and dual right turns.
Cost/Completion: $11.2 million. Completion is expected in June 2019.
Traffic Impact:
- None anticipated. For more information, please contact Andrea Pacini, Community Outreach Specialist, 561-214-3358.
Alternate State Road A1A/State Road 811 On-ramp to Southbound I-95 Bridge Painting Project
Description: This 657-foot bridge painting project began Monday, May 6, 2019, in Palm Beach Gardens. Work includes sandblasting the existing paint from the steel bridge structure and placing new paint on the steel bridge structure.
Cost/Completion: $373,586. Completion is expected in fall 2019.
Traffic Impact:
- RCA Center Drive underneath the bridge may have a flagging operation as needed. Shoulders may also be closed on the on-ramp. For more information, please contact Community Outreach Specialist Meredith Cruz at 561-641-6440.
I-95 Interchange Improvements at Donald Ross Road
Description: This interim interchange improvement project includes widening the I-95 northbound exit ramp and the I-95 southbound exit to accommodate a triple right turn and a triple left turn to eastbound Donald Ross Road, modifying lanes on Donald Ross Road to provide a triple left turn onto the I-95 southbound entrance ramp, widening the southbound entrance ramp to I-95 to accommodate the triple left turn from Donald Ross Road and removing old asphalt and resurfacing existing pavement.
Cost/Completion: $2.9 million. Completion is expected in June 2019.
Traffic Impact:
- None anticipated. For more information, please contact Andrea Pacini, Community Outreach Specialist, 561-214-3358.
I-95 Resurfacing from Indiantown Road to Bridge Road
Description: I-95 is being resurfaced from south of Indiantown Road (State Road 706) in the Town of Jupiter to north of Bridge Road (County Road 708) in Martin County. Improvements under this 9.8-mile project consist of resurfacing I-95 mainline from south of Indiantown Road (SR 706) to north of Bridge Road (CR 708) and the I-95 interchange ramps at Indiantown Road (Exit 87) and Bridge Road (Exit 96), and minor shoulder and guardrail repairs.
Cost/Completion: $17.18 million. Completion is expected in summer 2019.
Traffic Impact:
- I-95 may have two lanes closed in each direction, 9 p.m. until 5 a.m., Sunday night through Friday morning, for paving operations.
SOUTHERN PALM BEACH COUNTY PROJECTS
Palmetto Park Road, from State Road 7 to NW 2nd Avenue
Description: This 6.279-mile improvements project began Friday, Apr. 20, 2018, in Boca Raton. Work includeswidening the existing shared-use path & installing new curb ramps to meet current ADA standards, improving pedestrian and bicyclist access to mass transit options along Palmetto Park Road, minor roadway resurfacing at various side streets, and widening the westbound turn lane at Cardinal Avenue’s entrance to the Boca Raton Museum of Art School. The work will take place on the south side of the roadway, parallel to the eastbound lanes, from State Road 7 to NW 12th Avenue, and on both sides of the roadway from NW 12th Avenue to NW 2nd Avenue.
Cost/Completion: $4 million. Completion is expected in summer 2019.
Traffic Impact:
- The outside eastbound lane, between I-95 and SW 12th Avenue, and the outside westbound lane east of El Río Canal to NW 9th Avenue, may be closed, around-the-clock, Monday through Friday, for slope preparation, asphalt placement, sod placement, and sidewalk ramp and pathway improvements. Work will be done in sections, with the location of the closures shifting as needed within these zones. Please note, work is taking place in the vicinity of the bus stops at Palmetto Square and Saint Paul Lutheran Church and School. Bus stops remain open, but for the safety of pedestrians, bus riders, and the construction crews, please remain outside the closed work zone. Pedestrians may detour via the existing sidewalk on Palmetto Park Road at SW 12th Avenue (east of I-95) and walk on the north side of the road to access the Palmetto Square Shopping Center along the perimeter road bordering the shopping center. Pedestrians heading west on westbound Palmetto Park Road may detour via the existing sidewalk at SW 4th Avenue and walk on the south side of Palmetto Park Road until SW 9th Avenue to then cross Palmetto Park Road at such intersection to continue heading west. For more information, please contact Community Outreach Specialist Meredith Cruz at 561-641-6440.
Spanish River Boulevard Bridge Painting over the Intracoastal Waterway
Description: This 0.2-mile bridge painting project will begin Friday, July 12, 2019, between State Road A1A and US 1 over the Intracoastal waterway in Boca Raton. Work includes sandblasting the existing paint and repainting the steel bridge structure, repairing and rehabilitating the bridge span locks, and replacing the bridge piling jackets.
Cost/Completion: $2.4 million. Completion is expected in winter 2019.
Open House:
- A construction Open House will be held on Wednesday, June 19, 5 p.m. until 7 p.m. at the Boca Raton Public Library—Downtown Branch, 400 NW 2nd Avenue, Boca Raton, FL, 33432. Project staff will be available to answer questions during that time; no formal presentation will be made. Please see flyer attached. For more information, please contact Community Outreach Specialist Meredith Cruz at 561-641-6440.
US 1 Improvements Project from George Bush Boulevard to Murano Bay Drive
Description: This 4.3-mile roadway improvements project will begin in July 2019, in the cities of Delray Beach and Boynton Beach. Work includes milling and resurfacing, roadway reconstruction, concrete curb and gutter, driveway, sidewalk, bridge railing, and bike lane installation.
Cost/Completion: $5.4 million. Completion is expected in summer 2020.
Open House:
- A construction Open House will be held on Thursday, June 20, 5 p.m. until 7 p.m. at the Town of Hypoluxo Council Chambers, 7580 South Federal Highway, Hypoluxo, FL, 33462. Project staff will be available to answer questions during that time; no formal presentation will be made. Please see flyer attached. For more information, please contact Community Outreach Specialist Meredith Cruz at 561-641-6440.
State Road 7 Resurfacing Improvements Project from Atlantic Avenue to Boynton Beach Boulevard
Description: This 5.09-mile roadway improvements project will begin Monday, June 24, 2019, in the Delray Beach and Boynton Beach. Work includes milling and resurfacing with minor shoulder widening, drainage improvements and lighting upgrades, installation of gravity wall, guardrail, signing and pavement markings, and intersection improvements at Atlantic Avenue and Boynton Beach Boulevard, including traffic monitoring systems and pedestrian detection/signals.
Cost/Completion: $7.9 million. Completion is expected in late winter 2020.
Traffic Impacts:
- All lanes are open. Please see project info flyer attached. For more information, please contact Community Outreach Specialist Meredith Cruz at 561-641-6440.
US 1 Improvements Project from Hypoluxo Road to Waterway Drive
Description: This 1.4-mile roadway improvements project began Tuesday, June 11, 2019, in the Town of Lantana. Work includes milling and resurfacing with minor widening, concrete curb and gutter, driveway, and sidewalk installation.
Cost/Completion: $1.9 million. Completion is expected in spring 2020.
Open House:
- A construction Open House will be held on Thursday, June 20, 5 p.m. until 7 p.m. at the Town of Hypoluxo Council Chambers, 7580 South Federal Highway, Hypoluxo, FL, 33462. Project staff will be available to answer questions during that time; no formal presentation will be made. Please see flyer attached. For more information, please contact Community Outreach Specialist Meredith Cruz at 561-641-6440.
- One northbound lane may be closed, daily, 7 a.m. until 4 p.m., Monday through Friday, through summer 2019.
- One southbound lane may be closed, nightly, 8 p.m. until 7 a.m., Sunday night through Friday morning, through summer 2019.
CENTRAL PALM BEACH COUNTY PROJECTS
Southern Boulevard (SR 80) Bridges Replacement Project
Description This 0.76-mile project includes replacing the existing bascule (draw) bridge and tide relief bridge over the Intracoastal Waterway (ICWW) and Lake Worth Lagoon between the Town of Palm Beach and the City of West Palm Beach. The project limits are between Washington Road in West Palm Beach and State Road A1A/South Ocean Boulevard in Palm Beach. New decorative lighting, pedestrian features, traffic signals, signage and drainage are included. A temporary bridge has been built north of the existing bridge to maintain traffic while the replacement bascule bridge is under construction.
Cost/Completion: $93 million. Completion is expected in spring 2021.
Traffic Impact:
- There are no lane closures at this time.
- The east and west sidewalks on Flagler Drive, from Southern Boulevard to Worth Court North, and the south sidewalk on Southern Boulevard, from Washington Road to Flagler Drive, will be closed through summer 2020 for drainage installation and reconstruction of the roadways. In addition, the dedicated left-turn lane from northbound Flagler Drive to westbound Southern Boulevard will be eliminated until further notice. Pedestrians are detoured as follows:
- Pedestrians going north on Flagler Drive should: Go west on Worth Court North to Washington Road; go north on Washington Road to Southern Boulevard; go east on Southern Boulevard to Flagler Drive.
- Pedestrians going south on Flagler Drive should: Go west on Southern Boulevard to Washington Road; go south on Washington Road to Worth Court North; go east on Worth Court North to Flagler Drive.
Marine Impact:
- The navigable Intracoastal Waterway (ICCW) through the Southern Boulevard Bridge will have a full channel closure from 8 p.m. June 23 to 10 a.m. June 24 for a concrete pour of a main bascule pier.
- There will be half-channel closures from 6 a.m. to 6 p.m. Monday through Saturday. A full channel opening may be requested at other times if four-hour notice is provided by calling Project Superintendent Clay Bores at (407) 488-0738. During half-channel closures, the horizontal clearance through the bridge is 40 feet.
- The schedule of channel restrictions is published in the U.S. Coast Guard’s Local Notice to Mariners at www.navcen.uscg.gov.
- The Southern Boulevard Bridge opens for marine traffic twice per hour at 15 minutes and 45 minutes past the hour. For more information, please contact Community Outreach Specialist Angel Streeter Gardner at 561-886-8773.
State Road 80/Southern Boulevard and Lyons Road/Sansbury’s Way
Description: This 1-mile intersection improvement project, located in unincorporated Palm Beach County, began active construction on October 18, 2018. Work consists of adding eastbound right-turn lane and a second westbound left-turn lane from Southern Boulevard to southbound Lyons Road; adding a second right-turn lane from northbound Lyons Road to eastbound Southern Boulevard; and adding a second northbound lane on Lyons Road and Sansbury’s Way. Other improvements include minor roadway widening, widening the Lyons Road bridge over the C-51 Canal, milling and resurfacing, drainage improvements, curb and gutter, lighting, guardrails, signalization, sidewalk, signage and pavement markings.
Cost/Completion: $7.5 million. The project is expected to be completed in summer 2020.
Traffic Impact:
- The east sidewalk on Sansbury’s Way/Lyons Road is closed until further notice.
- The northbound right-turn lane from Southern Boulevard to the Shoppes at Southern Palms is closed until further notice.
- The dual left-turn lanes from eastbound Southern Boulevard to northbound Sansbury’s Way have been reduced to one lane until further notice. For more information, please contact Community Outreach Specialist Angel Streeter Gardner at (561) 886-8773.
NORTHERN PALM BEACH COUNTY PROJECTS
Blue Heron and Military Trail Lighting Improvements Project
Description: This 1.2-mile (Blue Heron Boulevard) and 5.2-mile (Military Trail) lighting project began Monday, Dec. 3, 2018 in the City of Palm Beach Gardens, the City of Riviera Beach, and unincorporated Palm Beach County. Work includes lighting retrofitting at three (3) intersections on Blue Heron Boulevard, and 11 sections on Military Trail.
Cost/Completion: $398,299. Completion is expected in summer 2019.
Traffic Impact:
- One lane may be closed in each direction on Military Trail, from Burns Road to Shiloh Drive, 9 a.m. until 3:30 p.m., daily, and 8 p.m. until 6:30 a.m., Sunday night through Friday morning.
- One lane may be closed in each direction on Blue Heron Boulevard from Military Trail to Congress Avenue, 10 p.m. until 6 a.m., Sunday night through Friday morning.
- One lane may be closed on side streets only, 9 a.m. until 3:30 p.m., Monday through Friday. For more information, please contact Community Outreach Specialist Meredith Cruz at 561-641-6440.
Blue Heron Boulevard Bridge Fender Replacement Project
Description: This 0.2-mile bridge fender replacement project will begin Friday, July 12, in the City of Riviera Beach. Work includes removing and replacing the bridge fender system and navigational lighting system and removing all platforms and ladders from the bridge.
Cost/Completion: $1,592,830. Completion is expected in spring 2020.
Open House:
- A construction Open House will be held on Tuesday, June 25, 5 p.m. until 7 p.m. at the City of Riviera Beach Council Chambers, 600 W. Blue Heron Boulevard, Riviera Beach, FL, 33404. Project staff will be available to answer questions during that time; no formal presentation will be made. Please see flyer attached. For more information, please contact Community Outreach Specialist Meredith Cruz at 561-641-6440.
Indiantown Road Intersection Improvements, from Island Way to US 1
Description: This 3.7-mile intersection improvements project began Wednesday, May 8, 2019, in Jupiter. Work includes include installing new light poles at 11 intersections, installing vehicle detection cameras, microwave detectors, and Bluetooth devices at 14 intersections, and installing asphalt pavement, patterned pavement, signage, and pavement markings at 10 intersections.
Cost/Completion: $3.3 million. Completion is expected in spring 2020.
Traffic Impact:
- The Center Street southbound inside turn & through lane at Indiantown Road will be closed, 7 p.m. Sunday night, June 16, through 3 p.m. Monday, June 17. Motorists traveling southbound on Center Street will be able to turn or head straight via the outside turn lane during this time.
- Portions of the sidewalk may be closed day and night for underground activities, as needed, with pedestrian detours in place. For more information, please contact Community Outreach Specialist Meredith Cruz at 561-641-6440.
State Road 710, from south of Pratt Whitney Road to south of Park of Commerce Blvd.
Description: This 1.01-mile resurfacing project began Monday, Feb. 18, 2019, in Jupiter. Work includes widening the inside shoulders, resurfacing the roadway, and installing signage and pavement markings.
Cost/Completion: $1.2 million. Completion is expected in fall 2019.
Traffic Impact:
- One lane may be closed in each direction, daily, Monday through Friday. For more information, please contact Community Outreach Specialist Meredith Cruz at 561-641-6440.
WESTERN PALM BEACH COUNTY PROJECTS
State Road 80/Southern Boulevard, from west of Lion Country Safari Road to Forest Hill Boulevard/Crestwood Boulevard
Description: Construction on this 7.2-mile widening project began Tuesday, July 31, 2018, in the Village of Royal Palm Beach, Village of Wellington and the Town of Loxahatchee Groves. Work includes widening the existing roadway from four to six lanes, adding a 12-foot shared-use pathway on the north side of the roadway, adding bike lanes, milling and resurfacing, drainage improvements, adding lighting and signalization, installing curb and gutter, guardrails, minor median modifications and signage and pavement markings.
Cost/Completion: $33 million. Completion is expected in summer 2021.
Traffic Impact:
- Southern Boulevard from west of Seminole Pratt Whitney Road to Arden Lake Way will have one westbound lane closed 9 a.m. to 3:30 p.m. daily Monday through Friday for median work.
- Southern Boulevard from Big Blue Trace/F Road to Cane Field Trace will have one lane closed in each direction nightly, 6:30 p.m. to 6:30 a.m., on Friday, June 14, and Saturday, June 15, as well as Friday, June 21, and Saturday, June 22, for paving operations.
- Southern Boulevard’s westbound inside through lane from east of Forest Hill Boulevard to Palms West Parkway will be closed starting Monday, June 17, through mid-July for median work.
- The dual left-turn lanes from eastbound Southern Boulevard to northbound Crestwood Boulevard and the dual left-turn lanes from northbound Forest Hill Boulevard to westbound Southern Boulevard will each be reduced to one lane starting Monday, June 17, through mid-July for median work.
- Southern Boulevard’s westbound to eastbound U-turn at Palm West Parkway will be closed starting Monday, June 17, through mid-July for median work. For more information, please contact Community Outreach Specialist Angel Streeter Gardner at (561) 886-8773.
Northern Palm Beach County Improvement District Permit Work:
- Southern Boulevard at Arden Lake Way may have one lane closed in each direction, 9 a.m. to 3:30 p.m., Monday through Friday, through Wednesday, June 12, for new traffic signal installation. For more information, please contact Project Manager Jake Ridinger at 772-340-7474.
MAINTENANCE, UTILITY, PERMIT & ADDITIONAL AGENCY PROJECTS
Traffic Impact: I-95 at Hood Road, in Palm Beach Gardens, may have one lane closed in each direction, 10 p.m. until 5 a.m., Sunday night through Friday morning, through Friday, June 28, for temporary median removal and shoulder repair. For more information, please contact Project Manager Andrew Maniotis at 561-718-0472.
Traffic Impact: I-95 will have a moving closure in the outside lane at the following locations: Glades Road in Boca Raton to north of Linton Boulevard in Delray Beach, the I-95 northbound exit ramp to Belvedere Road in West Palm Beach, Northlake Boulevard to PGA Boulevard in Palm Beach Gardens, 11:30 p.m. until 5 a.m., Monday night, June 17, for asphalt testing. For more information, please contact Paul Watt at 954-380-0895.
Traffic Impact: I-95 southbound at Hypoluxo Road, in Lantana, will have two outside lanes closed, 9 p.m. until 5 a.m., Monday night, June 17, for bridge joint repairs. For more information, please contact Paul Watt at 954-380-0895.
Traffic Impact: Hypoluxo Road at I-95, in Lantana, will have three eastbound outside lanes closed, 9 p.m. until 5 a.m., Tuesday night, June 18, for bridge joint repairs. For more information, please contact Paul Watt at 954-380-0895.
Traffic Impact: Hypoluxo Road at I-95, in Lantana, will have two lanes closed in each direction, 9 p.m. until 5 a.m., Wednesday night, June 19, for sign installation. For more information, please contact Paul Watt at 954-380-0895.
Traffic Impact: I-95 southbound at Gateway Boulevard, in Boynton Beach, will have one outside lane and a portion of the exit ramp closed, 9 a.m. until 3 p.m., Wednesday, June 19, for sign installation. For more information, please contact Paul Watt at 954-380-0895.
Traffic Impact: I-95 southbound at Southern Boulevard, in West Palm Beach, will have three outside lanes closed and two westbound lanes closed on the overpass over the Railroad tracks, 9 p.m. until 5 a.m., Thursday, June 20, for bridge maintenance. For more information, please contact Paul Watt at 954-380-0895.
Traffic Impact: US 1, just north of Ebbtide Drive in North Palm Beach, will have the inside lanes closed in each direction, 9 a.m. until 3:30 p.m., Monday through Friday, through Wednesday, July 3, landscape modifications in the median. For more information, please contact Erik Cooper at 561-478-7848.
Traffic Impact: US 1, from Gregory Road to Forest Hill Boulevard, in West Palm Beach, will have the northbound outside lane and sidewalk closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, July 12, for directional boring operations. For more information, please contact Jay Fisher at 321-423-3980.
Traffic Impact: Southern Boulevard, from Cleary Road to 70th Drive North, in West Palm Beach, will have the outside westbound lane and bike lane closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, July 12, for drainage work and light pole installation. For more information, please contact Lauren Casasus at 561-478-7848.
Traffic Impact: Forest Hill Boulevard, west of Jog Road in West Palm Beach, will have the eastbound inside lane closed, 9 a.m. until 3:30 p.m., Thursday, June 20, and Friday, June 21, for fiber optic cable installation. For more information, please contact Jay Fisher at 321-423-3980.
Traffic Impact: Southern Boulevard, from Haverhill Road to Caroline Avenue, in West Palm Beach, will have the westbound inside lane closed, 8 p.m. until 5 a.m., Monday through Friday, through Wednesday, July 3, for fiber optic cable installation. For more information, please contact Jay Fisher at 321-423-3980.
Traffic Impact: State Road A1A, north of Camino Real Road in Boca Raton, will have the northbound lane closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Wednesday, July 3, for fiber optic cable installation. For more information, please contact Luis Egozcue at 954-699-8713.
Traffic Impact: Federal Highway, between Woolbright Road and Southeast 18th Avenue in Boynton Beach, will have one northbound lane closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Monday, July 1, for water main connection. For more information, please contact Jonathan Criscone at 305-780-1510.
Traffic Impact: US 1/S. Federal Highway, between SE 8th Street and SE 7th Street in Boca Raton, may have one northbound lane and turn lane closed, 9 a.m. to 3:30 p.m., Monday through Friday, through Friday, Sept. 27, for new equipment and material deliveries and concrete pouring operations. For more information, please contact Teddy Van Wingen at 561-706-5642.
Traffic Impact: Military Trail, from 45th Street to Shiloh Drive, in West Palm Beach, will have the northbound outside lane closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, June 28, for FPL pole replacement operations. For more information, please contact Project Manager Latess Hill at 561-631-0663.
Traffic Impact: Military Trail, between Forest Hill Boulevard and Cypress Way W., in Palm Springs, may have two southbound lanes closed, 9 p.m. until 5 a.m., Sunday night through Friday, through Friday, July 12, for FPL pole replacement operations. For more information, please contact Project Manager Art Rodriguez at 561-475-0064.
Traffic Impact: Military Trail, between Forest Hill Boulevard and Cypress Way West, in Palm Springs, will have two southbound lanes closed, 9 p.m. until 5 a.m., Monday through Friday, through Friday, July 12, for FPL pole replacement operations. For more information, please contact Art Rodriguez at 561-475-0064.
Traffic Impact: State Road A1A, from Camino Real to Osceola Drive, in Boca Raton, may have one lane closed in each direction, intermittently, 9 a.m. to 3:30 p.m., Monday through Friday, through Friday, June 21, for FPL pole replacement operations. For more information, please contact Project Manager Cory Oxford at 601-572-5983.
Traffic Impact: Atlantic Avenue, from Florida’s Turnpike to Lyons Road, in Delray Beach, will have the westbound outside lane closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, June 21, for FPL pole replacement operations. For more information, please contact Project Manager Cory Oxford at 601-572-5983.
Traffic Impact: State Road 715 to County Road 827A, and Avenue M to County Road 872A, may have one eastbound and southbound lane closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, July 19, for FPL pole replacement operations. For more information, please contact Project Manager Art Rodriguez at 561-475-0064.
Traffic Impact: State Road 80, from SE 1st Avenue to State Road 715, in Belle Glade, will have one eastbound lane closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Monday, July 22, for FPL pole replacement. For more information, please contact Art Rodriguez at 561-475-0064.
Traffic Impact: State Road A1A, from Yacht Harbor Drive to N. Harbor Drive, in Riviera Beach, will have the northbound shoulder closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, June 21, for directional boring operations. For more information, please contact Raul Zamparripa at 772-473-5150.
Traffic Impact: Alternate A1A, from Center Street to Beach Road, in Jupiter, will have one northbound lane closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Wednesday, July 3, for pole replacement operations and overhead maintenance work. For more information, please contact Emily McLeer at 352-973-3511.
Traffic Impact: US 1, from Indiantown Road to Oceanside Terrace, in Jupiter, will have one southbound lane, shoulder and sidewalk closed, 9 a.m. to 3 p.m., Monday through Friday, through Friday, June 28. For more information, please contact [email protected].
Traffic Impact: US 1, from Juno Isles Boulevard in Juno Beach, to PGA Boulevard in Palm Beach Gardens, will have one southbound lane, shoulder and sidewalk closed, 9 a.m. to 3 p.m., with one westbound lane closed from US 1 to Prosperity Farms Road, in Palm Beach Gardens, Monday through Friday, through Friday, June 28. For more information, please contact [email protected].
Traffic Impact: State Road A1A, from Yacht Harbor Drive to N. Harbor Drive, in Riviera Beach, will have the northbound shoulder closed, 9 a.m. to 3:30 p.m., Monday through Friday, through Friday, June 21. For more information, please contact [email protected].
Traffic Impact: Spanish River Boulevard, from N. Federal Highway to Sea Ranch Club in Boca Raton, may have one outside lane, shoulder and sidewalk closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, June 28, for directional boring operations. For more information, please contact John Ross Pontorno at 786-479-9076.
Traffic Impact: Southern Boulevard at Haverhill Road, in West Palm Beach, may have one westbound lane, shoulder and sidewalk closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, July 12, for directional boring operations. For more information, please contact John Ross Pontorno at 786-479-9076.
Traffic Impact: State Road 7, from 105th Drive South to Winners Circle, in Boca Raton, may have one southbound outside lane, shoulder and sidewalk closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, July 12, for directional boring operations. For more information, please contact John Ross Pontorno at 786-479-9076.
Traffic Impact: Lake Worth Road, from Military Trail to Jog Road in Lake Worth, may have one westbound outside lane, shoulder and sidewalk closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, July 12, for directional boring operations. For more information, please contact John Ross Pontorno at 786-479-9076.
Traffic Impact: Glades Road, from St. Andrews Boulevard to NW 22nd Way, in Boca Raton, may have one eastbound outside lane, shoulder and sidewalk closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, June 28, for directional boring operations. For more information, please contact John Ross Pontorno at 786-479-9076.
Traffic Impact: State Road A1A, from Regents Park Road to Via Fontina Road, in Palm Beach, may have one lane and shoulder closed in each direction, intermittently, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, Aug. 16, for natural gas trenching operations. For more information, please contact Latess Hill at 561-631-0663.
Traffic Impact: State Road 7, between Winners Circle and Clintmoore Road, may have one lane closed in each direction, 9 a.m. until 3:30 p.m., Monday through Friday, through Monday, Aug. 12, for pole replacement operations. For more information, please contact Art Rodriguez at 561-475-0064.
Traffic Impact: State Road A1A, between N. Harbor Drive and S. Harbor Drive, in Riviera Beach, will have one northbound lane closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Monday, June 17, for pole installation. For more information, please contact Project Manager Art Rodriguez at 561-476-0064.
Traffic Impact: S. Dixie Highway, between Hypoluxo Road and E. Pine Street, in Lantana, will have one northbound lane, shoulder and sidewalk closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, July 12, for conduit installation. For more information, please contact Project Manager John Ross Pontorno at 786-479-9076.
Traffic Impact: US 1, between the Juno Dunes Preserve to Donald Ross Road, in Juno Beach, will have one southbound lane, shoulder and sidewalk closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, July 12, for conduit installation. For more information, please contact Project Manager John Ross Pontorno at 786-479-9076.
Traffic Impact: Southern Boulevard, between 105th Avenue N and Fairgrounds Road, and between Sansburys Way, in Royal Palm Beach, will have one lane closed in each direction, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, June 21, for directional boring operations. For more information, please contact Project Manager Raul Zamparripa at 772-473-5150.
Traffic Impact: Lake Worth Road, between Pinehurst Drive and Poinciana Drive, in Lake Worth, will have one southbound lane closed, 9 a.m. until 3:30 p.m., Monday through Friday, beginning Thursday, May 30, through Friday, June 21, for pole installation. For more information, please contact Project Manager Art Rodriguez at 561-475-0064.
Traffic Impact: State Road 7, between 105th Drive to Winners Circle, in Boca Raton, will have the outside southbound lane, shoulder and sidewalk closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, July 12, for directional boring operations. For more information, please contact Project Manager John Ross Pontorno at 786-479-9076.
Traffic Impact: Southern Boulevard at Kelly Drive, in West Palm Beach, will have one lane closed in each direction, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, June 21, for directional boring operations. For more information, please contact Jay Fisher at 321-423-3980.
Traffic Impact: Military Trail, between 10th Avenue North and Lake Worth Road, in Lake Worth, will have one southbound lane, shoulder and sidewalk closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, Aug. 2, for fiber installation. For more information, please contact Project Manager John Ross Pontorno at 786-479-9076.
Traffic Impact: Okeechobee Boulevard, between Benoist Farms Road and Jog Road, in West Palm Beach, will have one eastbound lane, shoulder and sidewalk closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, Aug. 2, for conduit installation. For more information, please contact Project Manager John Ross Pontorno at 786-479-9076.
Traffic Impact: Okeechobee Boulevard, between Register Road and Jog Road, in West Palm Beach, will have one westbound lane, shoulder and sidewalk closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, Aug. 2, for conduit installation. For more information, please contact Project Manager John Ross Pontorno at 786-479-9076.
Traffic Impact: PGA Boulevard, between Prosperity Farms Road and Fairchild Gardens Ave., in Palm Beach Gardens, will have one westbound lane, shoulder and sidewalk closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, Aug. 2, for conduit installation. For more information, please contact Project Manager John Ross Pontorno at 786-479-9076.
Traffic Impact: Forest Hill Boulevard, between Jog Road and Pinehurst Drive, in Greenacres, will have one westbound lane, shoulder and sidewalk closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, Aug. 2, for conduit installation. For more information, please contact Project Manager John Ross Pontorno at 786-479-9076.
Traffic Impact: Forest Hill Boulevard, between Pinehurst Drive in Greenacres and Olympia Boulevard in Wellington, will have one westbound lane, shoulder and sidewalk closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, Aug. 2, for conduit installation. For more information, please contact Project Manager John Ross Pontorno at 786-479-9076.
Traffic Impact: State Road 7, between Pioneer Road and Southern Boulevard, in Royal Palm Beach, will have one northbound lane, shoulder and sidewalk closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, Aug. 2, for conduit installation. For more information, please contact Project Manager John Ross Pontorno at 786-479-9076.
Traffic Impact: US 1, just south of Ocean Walk Boulevard in Jupiter, will have one southbound turn lane closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, June 28, for directional boring operations. For more information, please contact Project Manager Brantley Tate at 786-420-5950.
Traffic Impact: Beginning Monday, June 17, Congress Avenue, between Greenbrier Drive and Meadow Road, in Palm Springs, may have one lane closed in each direction, 9 a.m. until 3:30 p.m., Monday through Friday, through Wednesday, July 31, for traffic separator installation and paving operations. For more information, please contact Franz Favre at 561-644-5242.
Traffic Impact: Beginning Monday, June 24, State Road 7, between Yamato Road and Spanish Isles Boulevard, in Boca Raton, may have one southbound lane closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, Sept. 20, for pole installation. For more information, please contact Art Rodriguez at 561-475-0064.
Traffic Impact: Congress Avenue, between Summit Boulevard and Forest Hill Boulevard, in West Palm Beach, may have one southbound lane closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, Aug. 2, for conduit installation. For more information, please contact John Ross Pontorno at 786-479-9076.
Traffic Impact: State Road A1A/S. Ocean Boulevard south of Ibis Way, in Palm Beach, will have one southbound lane and shoulder closed, 9 a.m. until 3 p.m., Monday through Friday, through Friday, July 12, for asphalt repairs. For more information, please contact Chelsea Alexis at 561-469-6173.
Traffic Impact: Indiantown Road, between Daniels Way and Cypress Isle Street, in Jupiter, will have one westbound outside lane closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, June 21, for conduit installation. For more information, please contact Victor Aguirre at 561-891-3067.
Traffic Impact: Indiantown Road, between Daniels Way and Cypress Isle Street, in Jupiter, will have one westbound outside lane closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, June 21, for conduit installation. For more information, please contact Victor Aguirre at 561-891-3067.
Traffic Impact: Lake Worth Road, between Congress Avenue and Military Trail, in Lake Worth, will have the westbound outside lane, shoulder and sidewalk closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, Aug. 2, for conduit installation. For more information, please contact John Ross Pontorno at 786-479-9076.
Traffic Impact: S. Dixie Highway, between Hypoluxo Road and Pine Street, in Lantana, will have the northbound outside lane, shoulder and sidewalk closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, Aug. 2, for conduit installation. For more information, please contact John Ross Pontorno at 786-479-9076.
Traffic Impact: Forest Hill Boulevard, between Pine Tree Lane and Norton Avenue, in Lake Clarke Shores, will have the eastbound outside lane, shoulder and sidewalk closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, Aug. 2, for conduit installation. For more information, please contact John Ross Pontorno at 786-479-9076.
Traffic Impact: Dixie Highway, between Worthmore Drive and 13th Avenue North, in Lake Worth, will have the southbound outside lane, shoulder and sidewalk closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, Aug. 2, for conduit installation. For more information, please contact John Ross Pontorno at 786-479-9076.
Traffic Impact: State Road 7, between Cam Del Dios and Stonebridge Country Club Boulevard, in Boca Raton, will have the southbound outside lane, shoulder and sidewalk closed, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, Aug. 2, for conduit installation. For more information, please contact John Ross Pontorno at 786-479-9076.
Traffic Impact: Atlantic Avenue, between Florida’s Turnpike and Hagen Ranch Road, in Delray Beach, may have one outside lane closed in each direction, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, July 19, for pole installation. For more information, please contact Cory Oxford at 601-572-5983.
Traffic Impacts: Northbound and Southbound Florida’s Turnpike entrance ramps from Beeline Highway/SR 710: Full ramp closure, 9 p.m. to 6 a.m., Sunday, June 16 through Thursday, Sunday, June 20. Detour information: Beeline Highway/SR 710 traffic wishing to access northbound or southbound Florida’s Turnpike will be directed to travel north on Military Trail/SR 809 to PGA Boulevard and travel west on PGA Boulevard to access northbound or southbound Florida’s Turnpike. *Please note, entrance and exit ramps will not be closed at the same time. For more information, please contact Fiorella Teodista at 954-663-0612.
Traffic Impacts: Northbound and Southbound Florida’s Turnpike exit ramp to Beeline Highway/SR 710 (Exit 107): Full ramp closure, 9 p.m. to 6 a.m., Sunday, June 16 through Thursday, Sunday, June 20. Detour information: Northbound and southbound Florida’s Turnpike traffic wishing to access Beeline Highway/SR 710 will be directed to exit at PGA Boulevard (Exit 109) and continue east on PGA Boulevard to Military Trail/SR 809, travel south on Military Trail/SR 809 to access Beeline Highway/SR 710. *Please note, entrance and exit ramps will not be closed at the same time. For more information, please contact Fiorella Teodista at 954-663-0612.
Traffic Impacts: Northbound Florida’s Turnpike entrance ramp from PGA Boulevard/SR 786: Full ramp closure, 9 p.m. to 6 a.m., Sunday, June 16 and Monday, June 17. Detour information: PGA Boulevard traffic wishing to access northbound Florida’s Turnpike will be directed to Military Trail/SR 809, travel south on Military Trail/SR 809 to Beeline Highway/SR 710 and travel west on Beeline Highway/SR 710 to Jog Road to access northbound Florida’s Turnpike. *Please note, entrance and exit ramps will not be closed at the same time. For more information, please contact Fiorella Teodista at 954-663-0612.
Traffic Impacts: Southbound Florida’s Turnpike entrance ramp from PGA Boulevard/SR 786: Full ramp closure, 9 p.m. to 6 a.m., Sunday, June 16 and Monday, June 17. Detour information: PGA Boulevard traffic wishing to access southbound Florida’s Turnpike will be directed to Military Trail/SR 809 travel south on Military Trail/SR 809 to Beeline Highway/SR 710 and travel west on Beeline Highway/SR 710 to Jog Road to access southbound Florida’s Turnpike. *Please note, entrance and exit ramps will not be closed at the same time. For more information, please contact Fiorella Teodista at 954-663-0612.
Traffic Impacts: Southbound Florida’s Turnpike exit ramp to PGA Boulevard/SR 786 (Exit 109): Full ramp closure, 9 p.m. to 6 a.m., Sunday, June 16 and Monday, June 17. Detour information: Southbound Florida’s Turnpike traffic wishing to access PGA Boulevard/SR 786 will be directed to exit at Beeline Highway/SR 710 (Exit 107), travel south on Jog Road to Beeline Highway, travel east on Beeline Highway to Military Trail/SR 809 and travel north on Military Trail/SR 809 to access PGA Boulevard/SR 786*Please note, entrance and exit ramps will not be closed at the same time. For more information, please contact Fiorella Teodista at 954-663-0612.
Traffic Impacts: Northbound Florida’s Turnpike exit ramp to PGA Boulevard/SR 786 (Exit 109): Full ramp closure, 9 p.m. to 6 a.m., Sunday, June 16 and Monday, June 17. Detour information: Northbound Florida’s Turnpike traffic wishing to access PGA Boulevard/SR 786 will be directed to exit at Beeline Highway/SR 710 (Exit 107), travel south on Jog Road to Beeline Highway/SR 710, travel east on Beeline Highway/SR 710 to Military Trail/SR 809 and travel north on Military Trail/SR 809 to access PGA Boulevard/SR 786. *Please note, entrance and exit ramps will not be closed at the same time. For more information, please contact Fiorella Teodista at 954-663-0612.
Traffic Impact: The East Camino Real Bridge over the Intracoastal Waterway, in the City of Boca Raton, is closed for construction through June 2019. East Camino Real is closed from the Royal Palm Way/Boca Raton Resort and Club Roundabout to Cocoanut Road. Traffic will be detoured via Federal Highway (US 1), S.E. Mizner Boulevard, East Palmetto Park Road, and South Ocean Boulevard (State Road A1A). Local traffic accessing Spanish River Road will be closed at East Camino Real. Local traffic will be able to access Spanish River Road via Cocoanut Road and Ponce De Leon Road. The Hurricane Evacuation Route will be Palmetto Park Road. For more information, please contact the Palm Beach County Traffic Division at 561-684-4030.