The State Road (SR) A1A/Haven Ashe Bridge over the Boca Raton Inlet will close beginning Monday, Aug. 24. It will remain closed for up to 60 days as the bridge is repainted as a part of routine maintenance.
The bridge will be closed to both vehicle and pedestrian traffic. Marine traffic will be maintained through the navigable waterway. Traffic will be detoured as follows (see attached map):
- Traffic south of the bridge should: Go south on State Road A1A to Hillsboro Boulevard; go west on Hillsboro Boulevard to Federal Highway; go north on Federal Highway to Palmetto Park Road, go east on Palmetto Park Road to State Road A1A.
- Traffic north of the bridge should: Go north on State Road A1A to Palmetto Park Road; go west on Palmetto Park Road to Federal Highway; go south on Federal Highway to Hillsboro Boulevard; go east on Hillsboro Boulevard to State Road A1A.
For more information, please contact Community Outreach Specialist Angel Streeter Gardner at (561) 886-8773 or via email at [email protected].