• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
  • About
  • Advertise
  • Submit News
  • Contact Us

Capital Soup

Florida News Straight From the Source

  • Featured
  • Leaders
  • Government
  • Industry
  • Education
  • Opinion
You are here: Home / Government / Brant Drive Bridge Closure in Cities of Boca Raton, Delray Beach Begins Monday, Aug. 2

Brant Drive Bridge Closure in Cities of Boca Raton, Delray Beach Begins Monday, Aug. 2

Posted on July 28, 2021

FDOT Logo

Brant Drive will be closed from Oregon Lane to Avocet Road in the cities of Boca Raton and Delray Beach beginning Monday, Aug. 2, for construction of a new bridge over the C-15 Canal. It will remain closed for the duration of construction.

The bridge will be closed to both vehicle and pedestrian traffic. Boat traffic will be maintained in the waterway, although, there may be occasional restrictions. Traffic will be detoured as follows (see attached map):

  • Northbound traffic should go south on Brant Drive to East Country Club Boulevard, go south on East Country Club Boulevard to West Hidden Valley Boulevard, go east on West Hidden Valley Boulevard to North Dixie Highway, go north on North Dixie Highway to Lindell Boulevard, go west on Lindell Boulevard to Carl Bolter Drive, go south on Carl Bolter Drive to Brant Drive.
  • Southbound traffic should go north on Brant Drive to Carl Bolter Drive, go north on Carl Bolter Drive to Lindell Boulevard, go east on Lindell Boulevard to North Dixie Highway, go south on North Dixie Highway to West Hidden Valley Boulevard, go west on West Hidden Valley Boulevard to East Country Club Boulevard, go north on East Country Club Boulevard to Brant Drive.

The Brant Drive Bridge Replacement Project consists of replacing the two-lane Brant Drive Bridge over the C-15 Canal, constructing 10-foot shared-use paths in each direction, adding drainage and decorative lighting, upgrading signage and pavement markings, and milling and resurfacing. Construction is estimated to be completed in late 2022. The estimated construction cost is $2,472,960.

For more information, please contact Community Outreach Specialist Angel Streeter Gardner at (561) 886-8773 or via email at [email protected].

Share this article! Share on FacebookShare on Twitter

Filed Under: Government Tagged With: florida department of transportation

Primary Sidebar

    Submit News    

Florida Democratic Party Launches “Defend Our Dems” Program

Tallahassee, FL — Today, the Florida Democratic Party is proud to launch the “Defend Our Dems” program, an … [Read More...] about Florida Democratic Party Launches “Defend Our Dems” Program

House Democratic Leader Fentrice Driskell, Representatives Kelly Skidmore and Allison Tant Request FLDOE to Release Critical Data

TALLAHASSEE, Fla. – Earlier today, House Democratic Leader Fentrice Driskell (D–Tampa), Representative Kelly … [Read More...] about House Democratic Leader Fentrice Driskell, Representatives Kelly Skidmore and Allison Tant Request FLDOE to Release Critical Data

Florida Department of Juvenile Justice and Pinellas Technical College Host Signing Day Event for Students

  St. Petersburg, Fla. – The Florida Department of Juvenile Justice (DJJ) joined together with Pinellas … [Read More...] about Florida Department of Juvenile Justice and Pinellas Technical College Host Signing Day Event for Students

Keep in Touch

  • Email
  • Facebook
  • Twitter

Footer

News

  • Featured
  • Leaders
  • Government
  • Industry
  • Education
  • Opinion

About Us 

  • About
  • Advertise
  • Submit News
  • Contact Us

Keep in Touch

  • Email
  • Facebook
  • Twitter

Copyright © 2021
Terms & Conditions

© Copyright 2025 Capital Soup · All Rights Reserved ·