August 27 through September 3, 2021
Palm Beach County traffic will be affected this week by ongoing construction projects and maintenance work, Florida Department of Transportation (FDOT) officials report. Closures will be in effect on I-95 and in other areas throughout Palm Beach County for construction activities.
For around-the-clock, real-time, traffic information, visit www.fl511.com. To view real-time video of I-95 in Palm Beach County, visit the Florida Department of Transportation’s Palm Beach SMART SunGuide Transportation Management Center (TMC) website at www.smartsunguide.com. FDOT and the SunGuide™ Partners provide these free services. For updated lane closure information, please refer to www.d4fdot.com. Follow us on Twitter and Instagram @MyFDOT_SEFL, and Facebook @MyFDOTSEFL.
CONSTRUCTION PROJECTS
INTERSTATE 95
I-95 from south of SW 10th Street in the City of Deerfield Beach to south of Glades Road in the City of Boca Raton (95 Express Phase 3B-1)
Description: Work on this 4.8-mile 95 Express project includes widening and converting the existing I-95 HOV Lanes to Managed Lanes which will result in two tolled Express Lanes in each direction; the number of General Use lanes will remain the same. Other project improvements include bridge widenings at Palmetto Park Road and Camino Real, complete bridge replacement at the Hillsboro Canal, noise wall construction, portable traffic monitoring sites, toll gantry installation, Intelligent Transportation System (ITS) installation, ramp signaling at the I-95 entrance ramps from Palmetto Park Road, Express Lane markers and landscape relocation. For more information, please contact I-95 Community Outreach Specialist Andrea Pacini at (561) 214-3358 or [email protected].
Cost/Completion: $102 million / Completion is expected in fall 2021.
Traffic Impact:
- I-95 will have three lanes closed in each direction nightly, as needed, Sunday through Thursday nights, with the first lane closing at 9:30 p.m., the second lane closing at 10:30 p.m., and the third lane closing at 11:30 p.m. until 5:30 a.m.
- I-95 northbound Express Lanes at Sample Road and SW 18th Street will be closed nightly, as needed, 9 p.m. until 5:30 a.m., Sunday through Thursday.
- I-95 southbound Express Lanes at Palmetto Park Road will be closed nightly, as needed, 9 p.m. until 5:30 a.m., Sunday through Thursday.
Arterial Road Traffic Impact:
- Palmetto Park Road at I-95 will have two lanes closed in each direction nightly, as needed, Sunday through Thursday. The first lane will close at 9 p.m., and the second lane will close at 10:30 p.m. All lanes will be opened by 5:30 a.m.
- Palmetto Park Road at I-95 will have one lane closed in each direction daily, as needed, 9:30 a.m. until 3:30 p.m., Monday through Friday.
- Camino Real at I-95 will have one lane closed in each direction daily, as needed, 9:30 a.m. until 4 p.m., Monday through Friday.
Ramp Impact:
- The I-95 southbound exit ramp to Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via I-95 southbound, Hillsboro Boulevard, Military Trail and Palmetto Park Road. FHP will be on site to assist motorists.
- The I-95 southbound entrance ramp from westbound Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Military Trail and Hillsboro Boulevard. FHP will be on site to assist motorists.
- The I-95 southbound entrance ramp from eastbound Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Military Trail and Hillsboro Boulevard. FHP will be on site to assist motorists.
- The northbound entrance ramp from eastbound and westbound Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via I-95 southbound to Hillsboro Boulevard to I-95 northbound.
- The I-95 northbound entrance ramp from westbound Hillsboro Boulevard will be closed nightly, 11 p.m. until 5 a.m. Sunday through Thursday. Motorists will be detoured via Hillsboro Boulevard, Military Trail and Palmetto Park Road. FHP will be on site to assist motorists.
- The I-95 northbound entrance ramp from eastbound Hillsboro Boulevard will be closed nightly, 11 p.m. until 5 a.m. Sunday through Thursday. Motorists will be detoured via Military Trail and Palmetto Park Road. FHP will be on site to assist motorists.
- The I-95 southbound entrance ramp from westbound Hillsboro Boulevard will be closed nightly, 11 p.m. until 5 a.m. Sunday through Thursday. Motorists will be detoured via Hillsboro Blvd, Military Trail and SW 10th Street. FHP will be on site to assist motorists.
- The I-95 southbound entrance ramp from eastbound Hillsboro Boulevard will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Military Trail and SW 10th Street. FHP will be on site to assist motorists.
- Please note that ramp closures will be performed as needed per nighttime construction operations; consecutive ramps will not be closed at the same time.
I-95 from south of Glades Road to south of Linton Boulevard and SR 808/Glades Road from NW 22nd Way to West University Drive in the Cities of Boca Raton and Delray Beach (95 Express Phase 3B-2)
Description: 95 Express Lanes Phase 3B-2 will extend the existing Express Lanes north from just south of Glades Road to just south of Linton Boulevard in Palm Beach County. One lane will be added and the High Occupancy Vehicle (HOV) lane will be converted to create two Express Lanes in each direction. The number of General Use lanes will remain the same. Access to the Express Lanes will be provided via two designated ingress and egress locations—between Glades Road and Spanish River Boulevard and between Yamato Road and Linton Boulevard. The scope of work includes reconfiguration of the SR 808/Glades Road Interchange to a Diverging Diamond Interchange (DDI). Additional project improvements include overhead sign structure installation, Intelligent Transportation System (ITS) and Express Lane markers, new signalization, lighting, signing and pavement markings and ramp signalization at five interchanges from Glades Road to Linton Boulevard. Shoulder-mounted sound barrier walls will be constructed along I-95 northbound between Clint Moore Road and Linton Boulevard, ground-mounted sound walls will be installed on the south side of Yamato Road east of I-95 adjacent to the University Heights Community and along I-95 northbound south of Linton Boulevard adjacent to the Tierra Verde Community. The Clint Moore Road Bridge over I-95 will be fully reconstructed and the Glades Road bridge over the South Florida Regional Transportation Authority (SFRTA) railroad tracks and Military Trail and the I-95 bridge over the C-15 Canal (between Peninsula Drive and Linton Boulevard) will be widened. For more information, please contact I-95 Community Outreach Specialist Andrea Pacini at (561) 214-3358 or [email protected].
Cost/Completion: $148 million. Completion is expected in late 2023.
Traffic Impact:
- I-95 will have up to four lanes closed in each direction nightly as needed for paving, 9 p.m. until 6 a.m. Sunday through Thursday. The first lane will close at 9 p.m., the second lane will close at 9:30 p.m., and the third and fourth lane will close at 10 p.m.
- I-95 Southbound from Spanish River to Glades Rd will be in a new traffic pattern with traffic shifted to the outside to allow for median construction. This configuration is anticipated to be in place through summer 2021.
- I-95 northbound from Yamato Road to Linton Boulevard is in a new traffic pattern with traffic shifted to the outside to allow for median construction. This configuration is anticipated to be in place through summer 2021.
- I-95 northbound lanes, from Glades Road to Yamato Road, will be shifted to the outside to allow for median construction, beginning Sunday night, Aug. 28.
Glades Road Impact:
- Westbound Glades Road, between NW 22nd Way and West University Drive, is in a new traffic pattern with traffic shifted inside towards the median to allow for outside widening.
- Westbound Glades Road, between NW 22nd Way and West University Drive, will have one lane closed daily, 9:30 a.m. until 4 p.m., Monday through Friday and from 6 a.m. until 9 p.m., Tuesday and Sunday. Westbound Glades Road, between NW 22nd Way and West University Drive, will have one lane closed nightly at 9 p.m. and two lanes closed at 10 p.m., until 6 a.m., Monday through Saturday.
- Glades Road westbound and eastbound, between Butts Road and I-95, is shifted inside towards the median to allow for outside widening and drainage activities.
- Advanced Notice: Eastbound Glades Road, between NW 22nd Way and West University Drive, will be shifted to the median to allow for outside widening beginning Monday, Sept. 13
Clint Moore Road Impact:
- The Clint Moore Road bridge over I-95 is closed completely for reconstruction through summer 2022. Westbound traffic is being detoured via NW 2nd Avenue, Yamato Road and Congress Avenue. Eastbound traffic is being detoured via Park of Commerce Boulevard, Congress Avenue, Yamato Road and NW 2nd Avenue. Local neighborhood access is maintained; only the approaches and bridge over I-95 are closed.
Ramp Impact:
- The I-95 northbound entrance ramp from westbound Glades Road will be closed nightly as needed for paving, 10 p.m. until 5 a.m., Sunday through Friday. Traffic will be detoured via Powerline Road and Jog Road. FHP will be on site to assist motorists.
- The I-95 northbound exit ramp to Spanish River Boulevard will be closed nightly as needed for paving, 10 p.m. until 5 a.m., Sunday through Friday. Traffic will be detoured via I-95 north, Yamato Road east, US-1 and Spanish River Boulevard. FHP will be onsite to assist motorists.
- The I-95 northbound entrance ramp from Congress Avenue and Peninsula Corp. Drive will be closed nightly as needed, 10 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via I-95 and Yamato Road. FHP will be on site to assist motorists.
- The I-95 northbound exit ramp to Congress Avenue will be closed nightly as needed for paving, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via I-95 and Linton Boulevard. FHP will be on site to assist motorists.
- The I-95 northbound entrance ramp from eastbound Glades Road will be closed nightly as needed,11 p.m. until 5 am., Sunday through Thursday. Traffic will be detoured via Glades Road east, N. Federal Highway and Yamato Road. FHP will be on site to assist motorists.
- The I-95 northbound exit ramp to Yamato Road will be closed nightly as needed, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via Congress Avenue, Peninsula Corp Drive, Congress Avenue and Yamato Road. FHP will be on site to assist motorists.
- The I-95 southbound entrance ramp from westbound Glades Road will be closed nightly as needed, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via Glades Road west, Powerline Road and Palmetto Park Road. FHP will be on site to assist motorists.
- The I-95 southbound entrance ramp from eastbound Yamato Road/Spanish River Boulevard will be closed nightly as needed, 10 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via Yamato Road east, Federal Highway/U.S. 1 south and Glades Road. FHP will be on site to assist motorists.
- The I-95 southbound entrance ramp from Peninsula Corp Drive will be closed nightly as needed, 10 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via Congress Avenue and Yamato Road. FHP will be on site to assist motorists. Consecutive ramps will not be closed at the same time.
I-95 Milling and Resurfacing from North of Gateway Boulevard to Lantana Road in the City of Boynton Beach and Town of Lantana
Description: This 2.35-mile project includes milling and resurfacing I-95 in both directions as well as the entrance and exit ramps at Hypoluxo Road and Lantana Road. This project also includes median lighting upgrades. For more information, please contact Community Outreach Specialist Daniela Silva at (786) 441-3088 or [email protected].
Cost/ Completion: $11.9 million. Completion is expected in spring 2022.
I-95 Traffic Impact:
- I-95 in each direction will have intermittent shoulder closures, daily and nightly, as needed, Sunday through Thursday.
- I-95 southbound may have up to four lanes closed nightly 9:30 p.m. until 6 a.m. Sunday through Thursday. Two lanes of I-95 will be closed at 9:30 p.m., three lanes will be closed at 11 p.m., and four lanes will be closed at 1 a.m. until 5 a.m. All lanes will reopen by 6 a.m.
SR 704/Okeechobee Boulevard Eastbound to I-95 Southbound Ramp Improvements Project
Description: This 0.164-mile project includes widening eastbound SR 704/Okeechobee Boulevard to provide an exclusive turn lane to the I-95 southbound entrance ramp. For more information, please contact Community Outreach Specialist Daniela Silva at (786) 441-3088 or [email protected].
Cost/Completion: $635,418. Completion is expected in spring 2022
Traffic Impact: No traffic impacts.
I-95 Lighting and Roadway Improvements Project from south of State Road 706/Indiantown Road to County Road 708/SE Bridge Road
Description: This 11.59-mile I-95 improvements project started September 9, 2020 in Jupiter and Hobe Sound. Work includes installing new roadway lighting with LED luminaires, replacing the high mast lighting system with a conventional LED roadway lighting system, extending the northbound I-95 merge lane just north of Indiantown Road, extending the deceleration distances for the I-95 northbound to westbound Indiantown Road exit ramp and the I-95 southbound to eastbound Indiantown Road exit ramp, and installing wrong way vehicle detection systems at the Indiantown Road and SE Bridge Road I-95 interchanges and new advanced warning signage.
Cost/Completion: $12.3 million. Completion is expected in spring 2022.
Traffic Impact:
- The shoulder in both directions of I-95 will be intermittently closed Monday through Thursday from 6:30 a.m. to 6 p.m. through November 2021 for temporary asphalt placement, and conduit and light pole foundation installations.
- One lane in either direction of I-95 at the Indiantown Road interchange may be closed Sunday through Thursday night from 10 p.m. to 6 a.m. for roadway work.
- The outside ramp lane of the northbound I-95 to eastbound Indiantown Road exit ramp will be closed Monday through Thursday from 10 a.m. to 3 p.m. to install light pole foundations. During this time the exit ramp will still be open as motorists can use the inside left lane.
- One lane in each direction of Indiantown Road from the Turnpike entrance/exit to Island Way will be closed Monday through Thursday from 10 a.m. to 3 p.m. to install light pole foundations. During this time, shoulder closures along I-95 ramps to and from Indiantown Road may occur. For more information, please contact Community Outreach Specialist Melissa Readling at 772-359-5118.
SOUTHERN PALM BEACH COUNTY PROJECTS
Brant Drive Bridge Replacement Project
Description This 0.1-mile project in the cities of Boca Raton and Delray Beach consists of replacing the two-lane Brant Drive Bridge (Bridge No. 935501) over the C-15 Canal with a new bridge consisting of two travel lanes and 10-foot shared-use paths in each direction. Improvements also include constructing 10-foot shared-use paths in each direction north of the bridge, reconstructing sidewalks south of the bridge, adding decorative lighting and drainage, upgrading signage and pavement markings, reconstructing roadway approaches and milling and resurfacing.
Cost/Completion: $2.47 million/Late 2022
Traffic Impact:
- Brant Drive is closed from Oregon Lane to Avocet Road and will be closed for the duration of construction. Traffic will be detoured as follows:
-
- Northbound traffic should go south on Brant Drive to East Country Club Boulevard, go south on East Country Club Boulevard to West Hidden Valley Boulevard, go east on West Hidden Valley Boulevard to North Dixie Highway, go north on North Dixie Highway to Lindell Boulevard, go west on Lindell Boulevard to Carl Bolter Drive, go south on Carl Bolter Drive to Brant Drive.
- Southbound traffic should go north on Brant Drive to Carl Bolter Drive, go north on Carl Bolter Drive to Lindell Boulevard, go east on Lindell Boulevard to North Dixie Highway, go south on North Dixie Highway to West Hidden Valley Boulevard, go west on West Hidden Valley Boulevard to East Country Club Boulevard, go north on East Country Club Boulevard to Brant Drive. For more information, please contact Community Outreach Specialist Angel Streeter Gardner at 561-886-8773 or [email protected].
George Bush Boulevard Improvements Project
Description: This 0.8-mile roadway improvements project, from NE 2nd Avenue to State Road A1A in the City of Delray Beach, began Monday, July 19, 2021. The City of Delray Beach, as Project Sponsor, requested that the Florida Department of Transportation (FDOT), District Four design and construct this project through application to the Palm Beach Transportation Planning Agency and City of Delray Beach Resolution 06-18. Work includes milling and resurfacing with minor widening, concrete sidewalk and driveway replacement including curb and gutter improvements, signing and pavement marking upgrades including bike lane and detectable warning surfaces, and drainage and utility improvements.
Cost/Completion: $2 million. Completion is expected in summer 2023.
Traffic Impact:
- George Bush Boulevard, between NE 2nd Avenue and the Railroad Tracks just west of US 1, is closed around-the-clock for drainage installation through Thursday, Sept. 2, 2021.Detour routes are marked along NE 2nd Avenue, NE 9th Terrace, Dixie Boulevard, Lake Ida Road and US 1. Please note, work activities are being performed during daytime hours, Monday through Friday, 7:00 a.m. to 6:00 p.m., and Saturday, 8:00 a.m. to 4:00 p.m. During this time, the City of Delray Beach will also be performing utility repairs in this location. Emergency vehicle, local driveway and pedestrian access is being provided at all times.
- Advanced notice: George Bush Boulevard, between NE 3rd Avenue and US 1, will be closed around-the-clock for drainage installation beginning Monday, Sept. 13, 2021 through Saturday, Oct. 2, 2021. Detour routes will be marked along NE 2nd Avenue, NE 9th Terrace, NE 3rd Avenue, US 1, and NE 6th Avenue. Please note, work activities are only performed during daytime hours, Monday through Saturday: Monday through Friday, 7:00 a.m. to 6:00 p.m., and Saturday, 8:00 a.m. to 4:00 p.m. During this time, the City of Delray Beach will also be performing utility repairs in this location. Emergency vehicle, local driveway and pedestrian access will be provided at all times. For more information, please contact Community Outreach Specialist Meredith Cruz at 561-641-6440 or [email protected].
CENTRAL PALM BEACH COUNTY PROJECTS
Forest Hill Boulevard Improvements Project
Description: This 2.9-mile roadway improvements project began Tuesday, July 6, 2021, in Wellington, West Palm Beach, and Greenacres. Work includes milling and resurfacing, guardrail installation, upgrading curb ramps to meet Americans with Disabilities Act (ADA) standards, improvements to intersection street lighting, pedestrian signalization, and signage and pavement markings.
Cost/Completion: $3.5 million. Completion is expected in summer 2022.
Traffic Impact:
- One outside lane may be closed in each direction at the Pinehurst Drive and Eshleman Trail intersections, 10 a.m. until 4 p.m., Monday through Thursday.
- One outside lane may be closed in each direction at the Olympia Blvd./Via Buena Vida, Palm Beach Central High School and Lyons Road intersections, 9 a.m. until 2:30 p.m., Monday through Thursday.
- One outside lane may be closed in each direction at the State Road 7/US-441 intersection from 9 a.m. to 3 p.m., Monday through Thursday.
- One lane may be closed in each direction on Forest Hill Blvd. between Palm Beach Central High School and Okeeheelee Park, 9 a.m. until 2:30 p.m. (within 600 feet of an intersection) or 8 a.m. to 5 p.m., Monday through Thursday. For more information, please contact Community Outreach Specialist Meredith Cruz at 561-641-6440 or [email protected].
Southern Boulevard (SR 80) Bridges Replacement Project
Description This 0.76-mile project includes replacing the existing bascule (draw) bridge and tide relief bridge over the Intracoastal Waterway (ICWW) and Lake Worth Lagoon between the Town of Palm Beach and the City of West Palm Beach. The project limits are between Washington Road in West Palm Beach and State Road A1A/South Ocean Boulevard in Palm Beach. New decorative lighting, pedestrian features, traffic signals, signage and drainage are included. A temporary bridge has been built north of the existing bridge to maintain traffic while the replacement bascule bridge is under construction.
Cost/Completion: $95 million. Completion is anticipated in late 2021.
Traffic Impact:
- Flagler Drive from Southern Boulevard to Worth Court North is closed as the roadway is reconstructed. Sidewalks also are closed. Access will be maintained for local traffic only. Traffic will be detoured as follows:
-
- Traffic going north on Flagler Drive should: Go west on Worth Court North to Washington Road; go north on Washington Road to Southern Boulevard; go east on Southern Boulevard to Flagler Drive.
- Traffic going south on Flagler Drive should: Go west on Southern Boulevard to Washington Road; go south on Washington Road to Worth Court North; go east on Worth Court North to Flagler Drive.
Marine Impact:
- The navigable waterway through the Southern Boulevard Bridge is restricted to half channel navigation. Full channel openings will not occur. During half-channel closures, the horizontal clearance through the bridge is 45 feet.
- Bridge openings for the Southern Boulevard Bridge will be suspended from 7 p.m. to 7 a.m. daily between Aug. 16 and Sept. 3. Half-channel openings may be requested with four-hour notice by calling (407) 488-0738.
- The schedule of channel restrictions is published in the U.S. Coast Guard’s Local Notice to Mariners at www.navcen.uscg.gov.
- The Southern Boulevard Bridge opens for marine traffic twice per hour at 15 minutes and 45 minutes past the hour. For more information, please contact Community Outreach Specialist Angel Streeter Gardner at 561-886-8773 or [email protected].
City of West Palm Beach Utility Work: The City of West Palm Beach has closed Washington Road from Southern Boulevard to Malverne Road to perform emergency repairs to the sanitary sewer and drainage systems. For more information, contact Lina Camacho, West Palm Beach Senior Project Engineer, at (561) 494-1129 or [email protected]. Traffic will be detoured as follows:
- Northbound Washington Road traffic should: Go west on Malverne Road to Olive Avenue, go north on Olive Avenue to Southern Boulevard and go east or west on Southern Boulevard.
- Southbound Washington Road traffic should: Go west on Southern Boulevard to Olive Avenue, go south on Olive Avenue to Malverne Road, go east on Malverne Road to Washington Road.
WESTERN PALM BEACH COUNTY PROJECTS
State Road 25 Resurfacing Project from the Broward/Palm Beach County Line to Milepost 12.626
Description: Construction on this 12.626-mile resurfacing project began Wednesday, May 13, 2020, in Palm Beach County. Work includes milling and resurfacing the existing travel lanes and shoulders, including shoulder widening, concrete barrier wall installation, guardrail removal and replacement, and signage, pavement marking, and rumble strip installation.
Cost/Completion: $21.8 million. Completion is expected in fall 2021.
Traffic Impact:
- One lane may be closed intermittently in each direction, as needed, from the Broward/Palm Beach County Line to Milepost 12.626. The speed limit is also reduced to 45 mph in the construction zone. For more information, please contact Community Outreach Specialist Meredith Cruz at 561-641-6440 or [email protected].
State Road 80/Southern Boulevard, from west of Lion Country Safari Road to Forest Hill Boulevard/Crestwood Boulevard
Description: Construction on this 7.2-mile widening project began Tuesday, July 31, 2018, in the Village of Royal Palm Beach, Village of Wellington and the Town of Loxahatchee Groves. Work includes widening the existing roadway from four to six lanes, adding a 12-foot shared-use pathway on the north side of the roadway, adding bike lanes, milling and resurfacing, drainage improvements, adding lighting and signalization, installing curb and gutter, guardrails, minor median modifications and signage and pavement markings.
Cost/Completion: $34 million. Completion is expected in fall 2021.
Traffic Impact:
- Southern Boulevard’s eastbound inside lane between B Road/Binks Forest Drive and Palms West Parkway may be closed 9 a.m. to 3:30 p.m. Sunday through Thursday for work on manholes.
- Southern Boulevard’s westbound inside or outside lane between B Road/Binks Forest Drive and Cane Field Trace may be closed 9 a.m. to 3:30 p.m. Sunday through Thursday for work on the shoulder.
- One lane may be closed in each direction on Southern Boulevard at B Road/Binks Forest Drive, F Road/Big Blue Trace and Palms West Parkway from 8:30 p.m. to 6:30 a.m. Sunday through Thursday to install traffic signalization loops.
- One lane in each direction at Southern Boulevard intersections between Cane Field Trace and west of Palms West Parkway may be closed periodically from 9 a.m. to 3:30 p.m. Sunday through Thursday for sidewalk reconstruction.
- One lane may be closed periodically in each direction of Southern Boulevard from Palms West Parkway to Cane Field Trace from 9 a.m. to 3:30 p.m. Monday through Saturday. For more information, please contact Community Outreach Specialist Angel Streeter Gardner at (561) 886-8773 or [email protected].
State Road 700 Hurricane Irma Repairs Project
Description: Construction on this 6.3-mile repairs and safety improvements project began Friday, June 11, 2021, in western Palm Beach County. Work includes embankment repairs on State Road 700 adjacent to the L-10 Canal, including bank stabilization and revetments, replacing the existing span wire signals with mast arms at the intersections of State Road 700 & Muck City Road and State Road 700 & Hatton Highway, new guardrail installation, and replacing/adding traffic signs at various locations.
Cost/Completion: $8.2 million. Completion is expected in fall 2022.
Traffic Impact: State Road 700 is closed from West Main Street to Muck City Road for canal slope restoration and protection activities through September 30, 2021. Motorists may detour via State Road 15, State Road 80, and Hatton Highway. Emergency vehicles will be provided access at all times. For more information, please contact Community Outreach Specialist Meredith Cruz at 561-641-6440 or [email protected].
MAINTENANCE, UTILITY, PERMIT & ADDITIONAL AGENCY PROJECTS
Traffic Impact: Southbound I-95 beginning at the exit Ramp to 6th Avenue, in Lake Worth, 9 a.m. until 3:30 p.m., Monday through Friday, through Thursday, Sept. 30, 1 of 2 lanes closed, for maintenance work. For more information, please contact Erwin Mosqueda 561-985-4270.
Traffic Impact: The Boca Inlet Bridge (State Road A1A) over the Intracoastal Waterway in the City of Boca Raton, may have one outside lane closed in each direction as needed, 9:00 a.m. to 4:00 p.m. Monday, Sept. 6 through Friday, Sept. 10, for maintenance work. For more information, please contact Sergio Crer at 305-343-9601.
Traffic Impact: Southbound Florida’s Turnpike/SR 91 between Southern Boulevard/US 98/SR 80 (Exit 97) and Lake Worth Road/SR 802 (Exit 93)
Overnight full road closures, 10 p.m. to 5 a.m. Monday, August 30, and nightly through Thursday, September 2.
Detour information:
- Southbound Florida’s Turnpike/SR 91 traffic wishing to continue south will be directed to exit at Southern Boulevard/US 98/SR 80 (Exit 97), travel south on Pike Road to Southern Boulevard, travel west on Southern Boulevard to US 441/SR 7, travel south on US 441 to Lake Worth Road/SR 802 and travel east on Lake Worth Road to access southbound Florida’s Turnpike.
- Southern Boulevard/SR 80 traffic wishing to access southbound Florida’s Turnpike/SR 91 will be directed to US 441/SR 7, travel south on US 441 to Lake Worth Road/SR 802 and travel east on Lake Worth Road to access southbound Florida’s Turnpike.During this closure, southbound Florida’s Turnpike traffic will not be able to access the West Palm Beach Service Plaza (milepost 94). The Pompano Beach Service Plaza (milepost 65) and the Port St. Lucie/Fort Pierce Service Plaza (milepost 144) are alternate stops for Florida’s Turnpike drivers. For more information, please contact Fiorella Teodista at 954-934-1130.
Traffic Impact: Brightline, Jupiter – Riverside Dr. and Alternate A1A, day-time flagging operations, 7 a.m. to 5 p.m. to move materials for bridge construction, continuing through Summer 2021. Crossings may be closed briefly (1-2 minutes) as trucks enter and exit the right of way. For more information, please contact Katie Mitzner at 407-502-3587.
Traffic Impact: Eastbound and westbound Bee Line Highway at Commerce Boulevard, in Jupiter, 9 a.m. until 3:30 p.m., Monday through Friday, through Monday, Nov. 1, 1 of 2 lanes closed, for drilled shafts, directional bores, electrical service, mast arm poles and traffic lights installation. For more information, please contact Jake Ridinger 772-201-1621.
Traffic Impact: Northbound North Federal Highway between Southeast 9 Street and Southeast 7 Street, in Boca Raton, 9 a.m. until 3:30 p.m., Monday through Friday, through Monday, Aug. 30, 1 of 3 lanes closed, for building material loading delivery. For more information, please contact Carol Judd 786-999-3943.
Traffic Impact: Southbound State Road 7 at 14159 State Road 7, in Delray Beach, 8 a.m. until 4 p.m., Monday through Friday, through Thursday, Sept. 2, 1 of 3 closed, for watermain connection. For more information, please contact Lynne Holden 954-325-8582.
Traffic Impact: Southbound Highway A1A between East Riverside Drive and Center Street, in Jupiter, 9 a.m. until 5 p.m., Monday through Friday, through Tuesday, Nov. 30, 1 of 3 lanes closed, for maintenance on existing sewer force main. For more information, please contact Joe Jesteeadt 561-262-0289 and/or Ryan Chernekoff 561-262-3461.
Traffic Impact: Southbound US Highway 1 at intersection Marcinski Road, in Jupiter, 9 a.m. until 3:30 p.m., Monday through Friday, through Tuesday, Aug. 31, 1 of 2 lanes as needed, for sewer force main valve inspection and repair. For more information, please contact Ryan Chernekoff 561-262-3461.
Traffic Impact: Northbound US 441 just 800’ ft North of West Atlantic Avenue, in Delray Beach, 9 a.m. until 3:30 p.m., Monday through Friday,through Friday, Aug. 27, 1 of 2 lanes closed, for pole replacements. For more information, please contact Latess Hill 561-631-0663.
Traffic Impact: Westbound Atlantic Avenue between I-95 off ramp and Northwest 18 Avenue, in Delray Beach, 9 a.m. until 3:30 p.m., Monday through Friday, through Tuesday, Aug. 31, 1 of 3 lanes closed, for directional boring and conduits installation. For more information, please contact David Morris 954-258-2267.
Traffic Impact: Westbound East Atlantic Avenue between Northeast 7 Avenue and Northeast 6 Avenue, in Delray Beach, 9 a.m. until 3:30 p.m., Monday through Friday, through Friday, Sept. 10,1 of 2 lanes closed, to apply exterior elements. For more information, please contact Alex Bacallao 954-598-2081.
Traffic Impact: Eastbound PGA Boulevard at 3188 PGA Boulevard, in Palm Beach Gardens, 9 a.m. until 3:30 p.m., Monday through Friday, through Monday, Sept. 13, 1 of 3 lanes closed, for directional boring and conduit installation. For more information, please contact Antonio Seco 305-803-9769.
Traffic Impact: Westbound Boynton Beach Boulevard at 9840 South Military Trail, in Boynton Beach, 9 a.m. until 3:30 p.m., Monday through Friday, through Monday, Sept. 13, 1 of 4 lanes closed, for directional boring and conduit installation. For more information, please contact Antonio Seco 305-803-9769.
Traffic Impact: Northbound North Federal Highway between Southeast 9 Street and Southeast 7 Street, in Boca Raton, 9 a.m. until 3:30 p.m., Monday through Friday, through Thursday, Sept. 30, 1 of 3 lanes closed, for building material loading delivery. For more information, please contact Carol Judd 786-999-3943.
Traffic Impact: Eastbound and westbound Indiantown Road 2.3-miles east of I-95 over Jupiter Creek bridge 930420, in Jupiter, 9 p.m. until 4 a.m., Monday through Friday, through Thursday, Sept. 30, 1 of 3 lanes closed, for maintenance work. For more information, please contact Nick Vezyropoulos 727-504-4480.
Traffic Impact: Southbound State Road 7 over Hillsboro Canal bridge 860285, in Boca Raton, 9 p.m. until 4 a.m., Monday through Friday, through Thursday, Sept. 30, 2 of 4 lanes closed, for maintenance work. For more information, please contact Nick Vezyropoulos 727-504-4480.
Traffic Impact: Northbound State Road 7 over Hillsboro Canal bridge 860286, in Boca Raton, 9 p.m. until 4 a.m., Monday through Friday, through Thursday, Sept. 30, 1 of 3 lanes closed, for maintenance work. For more information, please contact Nick Vezyropoulos 727-504-4480.
Traffic Impact: Eastbound Forrest Hill Boulevard and just West of I-95 over WPB C-51 Canal bridge 930446, in West Palm Beach, 9 a.m. until 4 p.m., Monday through Friday, through Thursday, Sept. 30, 1 of 3 lanes closed, for slope abutment and displaced rock rubble maintenance work. For more information, please contact Nick Vezyropoulos 727-504-4480.