• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
  • About
  • Advertise
  • Submit News
  • Contact Us

Capital Soup

Florida News Straight From the Source

  • Featured
  • Leaders
  • Government
  • Industry
  • Education
  • Opinion
You are here: Home / Archives for State Road A1A

State Road A1A

State Road A1A Bridge Closure over Boca Raton Inlet Begins Monday, August 24

Posted on August 20, 2020

FDOT Logo

The State Road (SR) A1A/Haven Ashe Bridge over the Boca Raton Inlet will close beginning Monday, Aug. 24. [Read more…] about State Road A1A Bridge Closure over Boca Raton Inlet Begins Monday, August 24

Filed Under: Government Tagged With: Bridge closure, State Road A1A

Construction to begin early 2019 to reconstruct State Road A1A in Flagler County

Posted on November 30, 2018

FDOT Logo

The Florida Department of Transportation (FDOT) has executed a contract to construct improvements along State Road (S.R.) A1A in Flagler County to repair damage caused by Hurricane Matthew and to fortify the roadway against future events. [Read more…] about Construction to begin early 2019 to reconstruct State Road A1A in Flagler County

Filed Under: Government Tagged With: Flagler County, florida department of transportation, State Road A1A

FDOT Hosting Public Meeting on Improvements at S.R. A1A and 520 Intersection

Posted on May 16, 2018

The Florida Department of Transportation (FDOT is holding a public information meeting regarding plans to improve the intersection of State Road (S.R.) A1A at S.R. 520 from Brevard Lane to north of S.R. 520 in Brevard County.

The proposed improvements include removing the free flow right turn lanes, realigning the east approach and extending the northbound dual left turn lanes. Also included in the project is the extension of the existing northbound left turn lane at the intersection of S.R. A1A and Canaveral Plaza Boulevard (Marion Lane), and various pedestrian safety improvements.

The meeting is scheduled for Tuesday, May 22, at the Cocoa Beach Country Club, River Room, 5000 Tom Warriner Boulevard in Cocoa Beach. The meeting is an open house from 5-7 p.m., and includes a brief presentation at 5:30 p.m. The purpose of the meeting is to inform interested persons of the proposed improvements and receive their feedback.

Participants may provide comments during the meeting, by email or by mail. Written comments should be directed to Mr. Gene Varano, FDOT Project Manager, 719 S. Woodland Boulevard, MS 542, DeLand, FL 32720, or [email protected]. Comments mailed should be postmarked no later than Monday, June 4, 2018. All comments, written and oral, will become part of the project’s public record.

Persons with disabilities who require accommodations under the Americans with Disabilities Act or persons who require translation services (free of charge) should also contact Mr. Gene Varano. If you are hearing or speech impaired, please contact us by using the Florida Relay Service, 1-800-955-8771 (TDD), or 1-800-955-8770 (Voice).

Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status.  Persons wishing to express their concerns relative to FDOT compliance with Title VI may do so by contacting the FDOT District Five Title VI Coordinator, at [email protected].

Media inquiries should be directed to the FDOT Communications Office at 386-943-5479 or [email protected].

FDOT advises drivers to slow down and use extra caution in construction zones.

Filed Under: Featured Tagged With: Brevard County, FDOT, florida department of transportation, Public meeting, State Road A1A

State Road (S.R.) A1A Public Hearing

Posted on October 25, 2017

South 22nd Street to South 9th Street permanent repairs


The Florida Department of Transportation (FDOT) is holding a public hearing regarding the portion of S.R. A1A from South 22nd Street to South 9th Street. The department is designing permanent repairs as a result of damage caused by Hurricane Matthew and other coastal storm events. The project is funded for construction in summer of 2018, after July 1. No additional right of way will be required. Other information:

  • Estimated cost is $4.99 million
  • The new road will have two lanes (one in each direction) and a median in portions of the section; the intent of the median is to retain storm water runoff
  • Recommended posted speed limit of 30 miles-per-hour
  • The project also proposes installing sand and native plantings on the east side SR A1A between the road and the right of way line.

The hearing is Thursday, November 2, 2017, at the Flagler Beach Methodist Church, 1520 South Daytona Avenue, Flagler Beach, Florida 32136. The purpose of this hearing is to introduce the project and present the design concept to the public. The hearing will begin as an open house at 5:30 p.m. A formal presentation will begin at 6 p.m., followed by a comment period. A court reporter will prepare a verbatim transcript of the proceedings. Persons wishing to submit written statements or other exhibits, in place of or in addition to oral statements, may do so at the hearing or by sending them to Mr. Ty Garner, FDOT Project Manager, [email protected], 386-943-5299, 719 South Woodland Boulevard, DeLand, Florida 32720. All exhibits or statements postmarked on or before November 13, 2017, will become part of the Public Hearing record.
Persons with disabilities who require accommodations under the Americans with Disabilities Act or persons who require translation services (free of charge) should contact Ty Garner, FDOT Project Manager, by phone at 386-943-5299 or via email at [email protected]. If you are hearing or speech impaired, please contact us by using the Florida Relay Service, 1-800-955-8771 (TDD) or 1-800-955-8770 (Voice).
Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status.  Persons wishing to express their concerns relative to FDOT compliance with Title VI may do so by contacting Jennifer Smith, FDOT District Five Title VI Coordinator by email at [email protected].
The environmental review, consultation, and other actions required by applicable federal environmental laws for this project are being, or have been, carried out by the Florida Department of Transportation (FDOT) pursuant to 23 U.S.C. §327 and a Memorandum of Understanding dated December 14, 2016 and executed by the Federal Highway Administration and FDOT.
Media inquiries may be directed to the FDOT regional communications office at: 386-943-5479; [email protected]; [email protected]; [email protected].

Filed Under: Featured Tagged With: FDOT, Public Hearing, State Road A1A

Primary Sidebar

    Submit News    

Florida Democratic Party Launches “Defend Our Dems” Program

Tallahassee, FL — Today, the Florida Democratic Party is proud to launch the “Defend Our Dems” program, an … [Read More...] about Florida Democratic Party Launches “Defend Our Dems” Program

House Democratic Leader Fentrice Driskell, Representatives Kelly Skidmore and Allison Tant Request FLDOE to Release Critical Data

TALLAHASSEE, Fla. – Earlier today, House Democratic Leader Fentrice Driskell (D–Tampa), Representative Kelly … [Read More...] about House Democratic Leader Fentrice Driskell, Representatives Kelly Skidmore and Allison Tant Request FLDOE to Release Critical Data

Florida Department of Juvenile Justice and Pinellas Technical College Host Signing Day Event for Students

  St. Petersburg, Fla. – The Florida Department of Juvenile Justice (DJJ) joined together with Pinellas … [Read More...] about Florida Department of Juvenile Justice and Pinellas Technical College Host Signing Day Event for Students

Keep in Touch

  • Email
  • Facebook
  • Twitter

Footer

News

  • Featured
  • Leaders
  • Government
  • Industry
  • Education
  • Opinion

About Us 

  • About
  • Advertise
  • Submit News
  • Contact Us

Keep in Touch

  • Email
  • Facebook
  • Twitter

Copyright © 2021
Terms & Conditions

© Copyright 2025 Capital Soup · All Rights Reserved ·